Automatic cataphoretic dip and powder coating

Location: Germany

For trailers, trailer parts and parts for cooling containers

The system consists of three (3) automatic cranes bidges, four (4) automatic cranes and one (1) semi-automatic crane.

  • Installation date:  2004
  • Capacity:              5000 kg


In 2004, CTI Systems delivered a full automatic flow of material for a surface treatment plant. The automatic material flow starts in preparation department, where all parts are fixed to carriers and ends in the final assembly line following the department of pretreatment and powder coating. The link between the individual departments is realized by a bi-rail system, transfers are executed by a friction wheel carriage.


More references in Surface treatment