Automatic cataphoretic dip and powder coating

Location: Germany

For trailers, trailer parts, busses and steel structures

The system consists of two (2) automatic crane bridges, two (2) automatic cranes and three (3) automatic gantries.

  • Installation date:  2004
  • Capacity:             5400 kg


In 2004, CTI Systems delivered an automated flow of material for the largest surface treatment plant in Europe. The automatic material flow starts in the preparation department, where the parts are fixed to beams and ends again in the preparation department following the department of pretreatment, cathodic e-coating, heat treatment and powder coating. The link between the departments is realized by a combined monorail and bi-rail system.