The system consists of two (2) automatic crane bridges, two (2) automatic cranes and three (3) automatic gantries.
In 2004, CTI Systems delivered an automated flow of material for the largest surface treatment plant in Europe. The automatic material flow starts in the preparation department, where the parts are fixed to beams and ends again in the preparation department following the department of pretreatment, cathodic e-coating, heat treatment and powder coating. The link between the departments is realized by a combined monorail and bi-rail system.