Modification of the existing BelugaST loading facilities at Airbus Méaulte (France)

Back to news list
Modification of the existing BelugaST loading facilities at Airbus Méaulte (France)

Last year, CTI was awarded the contract to modify the existing BelugaST loading facilities at Airbus Méaulte (France) in order to extend its use to the new BelugaXL. In addition, an extensive modernisation of the related electrical systems has been performed. The upgrade was successfully completed by the end of 2020.

Photos: ©Airbus

Back to top